304 vs. 316 Stainless Steel, PE & PTFE for Chemical Mixer Wetted Parts
By TEKNECMIX
Start with the exact liquid composition, concentration, operating temperature and cleaning process. Compare chemical resistance and mechanical suitability for every component that contacts the liquid. TEKNECMIX can review custom assemblies through OEM/ODM; confirm any PE or PTFE design and its availability in the quotation.
Engineering selection table
| Material | Why consider it | What needs review |
|---|---|---|
| 304 stainless steel | Stiff metallic shaft and impeller option | Exact liquid, temperature, contaminants and cleaning chemistry |
| 316 stainless steel | Alternative alloy to evaluate where 304 lacks suitable resistance | Chemical-specific data, surface condition, fabrication and local corrosion risk |
| PE (polyethylene) | Candidate polymer for a compatible nonmetallic part | Exact resin grade, temperature, stiffness, creep and rotating load |
| PTFE | Candidate for chemically resistant wetted construction | Exact grade and construction, load, wear, coatings or exposed joints |
Specify the entire wetted assembly
List shaft, impeller, fasteners and any seals or exposed substrate. Provide the safety data sheet, concentration range, impurities, operating and cleaning temperatures, immersion time, solids and intended service life. Specify whether you want a solid component, a lining or an encapsulated design. For uncertain service, agree on representative material testing with the supplier.
Discuss OEM/ODM manufacturing · Request a TEKNECMIX application review.
Material references
- Outokumpu stainless-steel corrosion tables and test limits
- SIMONA polyethylene material reference
- Chemours PTFE resin technical information
Frequently asked questions
Is 316 suitable for every strong acid or alkali?
Suitability depends on the specific formulation, concentration, temperature, exposure and construction. Review the exact conditions before specifying an alloy.
Can I order PE or PTFE shafts and impellers as standard stock?
Request an ODM review. The material, construction and supply scope are confirmed for the project in the quotation.